Saturday, June 25, 2011
Rejig of Posters for FINAL SHOW
Going to be working on my poster designs for the Birmingham show, as the prints were not to professional and acceptable to what I was trying to portray, as most of the visitors were confused.
Sunday, June 12, 2011
Saturday, May 21, 2011
Pyramids
Right, the installation is complete now. I'm actually tired of looking at pyramids, and I don't wanna set sight on them till the weekend.
One week remaining; and loose ends need to be tied.
Taking down to LONDON;
• 3x books
• Pyramid installation
• Laptop/charger+VGA cable+projector+extension lead+tape to cover the cables
• 4 A1 Posters + Fishing wire + sticky ceiling hooks + bulldog clips
• Masking tape + Masonry paint for the floor + tape measure
Some way of cutting off the installation and stopping the visitors walking through it. Either red tape masked around the white painted 3x3m2 square or fenced off?
One week remaining; and loose ends need to be tied.
Taking down to LONDON;
• 3x books
• Pyramid installation
• Laptop/charger+VGA cable+projector+extension lead+tape to cover the cables
• 4 A1 Posters + Fishing wire + sticky ceiling hooks + bulldog clips
• Masking tape + Masonry paint for the floor + tape measure
Some way of cutting off the installation and stopping the visitors walking through it. Either red tape masked around the white painted 3x3m2 square or fenced off?
Friday, May 20, 2011
Book & Installation so far...
The installation has been undercoated, and now needs a gloss finish + an extra smaller, flatter ramp-style pyramids to complete the set. If I can figure how to create them, then they will be constructed, if not, I wil be constructing smaller sized pyramids to become over shadowed by the taller ones.
My book so far. It needs to be binded (japanese binded) along side this, another 2 more books need to be made, which will be done during Monday morning & during Tuesday's lesson.
• Edit of the motion graphics that will be projected over the installation, needs to be done
• And macro shots of the smaller installation to be printed out as A1 prints alongside the two typographic posters.
ON SCHEDULE!
Wednesday, May 18, 2011
Wednesday 18th May 2011
Painting starts. I will be doing at least three layers, the bottom two will be done by brush, while the top layer will be done with a roller to not leave a brush marks.
Tuesday, May 17, 2011
Monday, May 16, 2011
Monday 16th May
Completion of ALL 8 pyramids, sanded down and the back panel glued on.
Tomorrow will be when I start painting them all white.
• I will be constructing 4 more smaller ones on the Thursday morning.
• Thursday afternoon, start of the book binding.
Tomorrow will be when I start painting them all white.
• I will be constructing 4 more smaller ones on the Thursday morning.
• Thursday afternoon, start of the book binding.